Bump-out
$70,000 – $130,000
100–200 square feet — a dinette, an enlarged primary bath, a mudroom, or a sunroom off the back, on a new foundation or cantilever.
Kitchens · Baths · Basements · Additions · Whole Home · Decks
An addition is the only remodel where you can see the seam from the street. Matching a twenty-year-old roofline, siding profile, and window proportion takes more planning than the framing does — and it is the difference between a house that grew and a house that has a box on the back.

What's included
Before you commit
What it costs
Bump-out
$70,000 – $130,000
100–200 square feet — a dinette, an enlarged primary bath, a mudroom, or a sunroom off the back, on a new foundation or cantilever.
Single-story addition
$150,000 – $280,000
300–500 square feet of new finished space: a family room, a primary suite with bath and closet, or a kitchen expansion with the adjoining rooms reworked.
Second story or multi-room
$280,000 – $500,000+
A full second story, a large multi-room wing, or an in-law suite with its own entrance, kitchen, and bath.
These are what addition projects like these run around Crystal Lake and the surrounding northwest suburbs — from the remodels Tim has paid for himself and what the crews we hire quote today.They are not a quote. Yours depends on the house, the layout, and what you pick. You'll get a fixed-scope written proposal after the consultation, at no charge and with no obligation.
Timeline
Build time on site
4–8 months
From signed proposal to start
2–5 months
Design, engineering, and village approval run before any site work. On an addition, that front half is most of the calendar — and skipping it is how additions go wrong.
How it works
A phone call or a form. Fifteen minutes.
Tim walks the space with you. No charge, no pitch.
Layouts, materials, and allowances settled on paper.
Fixed scope, line-item price, payment schedule, start date.
Dust walls up, floors covered, one person accountable.
Punch list, final walk, and the paperwork on everything installed.
Combining projects into one contract saves a second mobilization and a second round of dust. If something else is on the list, say so at the consultation.

Full gut kitchens, layout changes, cabinetry, stone, and the structural work behind an open floor plan.

Gut bathroom remodels, curbless and tiled showers, primary suites, and the waterproofing nobody else shows you.

Full basement build-outs: family rooms, baths, bars, gyms, and in-law suites, done dry and done to code.